Petaling Hash House HarriersPetaling HHHRunning since 1977
Login Run with us!
Complete run information

Run #2280

Saturday, 18 June 2022

Back to Our Runs
Venue
Lembah Beringin / Kerling
Directions & maps

(4km before Japanese Bridge)

DIRECTIONS: Drive north on NS Highway for Exit 120 Lembah Beringin;
0.0 km trip meter at toll;
0.7 km turn left to proceed to Kerling;
2.2 km turn right;
3.9 km turn left;
9.1 km bear right, sign posted ‘Kg. Org Asli/ K.Kerling’; and at
9.3 km turn left onto runsite beside river.
Park orderly.

Scribe
Oliver Storzer
Comic
Francesco
After the run

On-On restaurant

On-On restaurant details have not been published yet.